Engineering & Transportation

  1. Mill/Inlay Project

    On Monday, September 23 the contractor for the Mill/Inlay Project will begin removing the existing pavement at Northcrest Drive between Loop 250 and Briarwood Ave. also Amistad Drive between Loop 250 and Briarwood Ave. Read on...
View All

Infrastructure items owned and maintained by the City of Midland include water and sewer lines, storm water drainage systems, and street and alleys. The Engineering Services Department's goal is to ensure that new public improvements are designed to mesh with existing infrastructure, are sized to handle future development, and are constructed in a way that will be easy to maintain.

Learn More: